Latchways® Vertical System - How to Install to an Aluminium Ladder
This module is for persons who are required to carry out installations, inspections and using Latchways vertical systems on the following structures:
- Wind turbines fitted with aluminium ladders
- Aluminium access ladders
Note: This module requires completion of the mandatory half-day Prerequisites & Introduction module unless it was completed within the last 3 years. This additional module can be added to the basket during the online booking process.
Course Contents
- Install a Latchways vertical system to an aluminium ladder.
- Install a temporary rope system to an aluminium ladder.
- Install a permanent vertical system to an aluminium ladder using a 7 or 10 rung extension post (ground installation method).
- Install a permanent vertical system to an aluminium ladder using a 7 or 10 rung extension post (retro fit).
- Uninstall a temporary rope system post permanent system installation.
- Install a vertical system to an aluminium ladder using a 3 rung top anchor and strengthening kit (ground installation method).
- Install a vertical system to an aluminium ladder using a 3 rung top anchor and strengthening kit (retro fit).
Learning Outcomes
To be able to install a Latchways vertical system to an aluminium ladder.
Download course overview
- Half a Day
- Min 3 Max 6 people
- Training Academy or on-site
- MSA Latchways Certificate
- Valid for 3 years
- Requires completion of mandatory Prerequisites & Introduction module in the past 3 years
Course Reviews
Thanks Andy!
18 September 2024
Everything perfect
18 September 2024
Happy with presentation of course.
18 September 2024